A bi-monthly inspection of M/S Kundan Hydro Power Project Pvt. Ltd. (Kalez HEPs) in Dentam was carried out on Thursday by a district team led by Ganesh Kumar Rai, DPO (DDMA).
The team, including officials from power, civil, forest, and fire departments, reviewed the Trench Weir, Desilting Tank, and Power House, with emphasis on disaster management readiness, safety infrastructure, and fire safety measures.
Officials directed the project management to complete essential repairs, including a footpath and fencing around the Desilting Tank, within a month. As per Fire and Emergency Services guidelines, two hydrants with a minimum storage capacity of 50,000 liters, sprinkler systems, and smoke and heat detection devices are to be installed outside the power house.
The inspection concluded with satisfactory outcomes.